Cover ImageDuke Power
Final Shoreline Management
Plan Update for the
Catawba-Wateree Hydro Project

(FERC No. 2232)

Appendices Table of Contents


Submitted by:

Duke Power, A Division of
Duke Energy Corporation

Group Environment
Health and Safety
Lake Management

July 30, 2001

Prepared by:
The Louis Berger Group, Inc.
Needham, MA

 

Catawba-Wateree Shoreline Management Plan

Appendix Table of Contents

Appendices Table of Contents

Appendix A - Final Woody Debris Study and Recommendations.
Appendix B - Recreational Use and Needs Study
Appendix C - Cultural Resources Study
Appendix D - The Catawba (Large File - 16 MB Adobe Acrobat File)
Appendix D - The Catawba (Small File - View pages as a connected series of single pages)
Appendix E - Riparian Zone Management Informational Pamphlet and Fish Friendly Pier Pamphlet
Appendix F - Shoreline Management Guidelines Revised June 1, 1996
Appendix G - 2001 Catawba-Wateree Shoreline Classifications
Appendix H - Species Protection Plans
Appendix I - Response to Comments (Adobe Acrobat File 2.2 MB)
Appendix J - Focus Group Participants
Appendix K - Pumpout Workshop Attendees
Appendix L - Pumpout Study
Appendix M - Commercial Marina Operators Workshop Agenda
Appendix N - Structure Renovation Program
Appendix O - Procedure for Addressing Challenges to Shoreline Management Plan Mapping Accuracy